About this project
The project with the capacity of 1000m³/d is to sort the landfill waste. The main purpose of this project is to screen out most of the combustibles, construction waste (bricks, tiles, ceramics, etc.) and humus from Landfill waste (mineralized waste). The humus is used for landscaping or mine restoration, construction waste is backfilled in situ, and combustibles are transported to incineration power plants for incineration. In this way, the landfill can be reused.